Who out there requires safety disconnect accessible to the utility when the customer adds generation? Minnesota Power requires an easily accessible disconnect and it must provide a visual open that is also lockable by the utility. We also this lockout point to be located within 10 ft of the main metering point. We grant no exceptions to this standard.
The Upper Midwest Metering Association serves the upper midwest states of Minnesota, Iowa, Wisconsin, South Dakota, and North Dakota. We provide connections for members, utilities, meter schools, and vendors in our bi-annual meetings and continuous dialog throughout the year.